首页 体育正文

新2最新网址(www.hg108.vip):Fukushima debris removal delayed by another year

admin 体育 2022-08-28 04:30:12 2 0

新2最新网址www.hg108.vip)实时更新发布最新最快最有效的新2网址和新2最新网址,包括新2手机网址,新2备用网址,皇冠最新网址,新2足球网址,新2网址大全。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

欧博客户端下载www.aLLbet8.vip)是欧博集团的官方网站。欧博官网开放Allbet注册、Allbe代理、Allbet电脑客户端、Allbet手机版下载等业务。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。
版权声明

本文仅代表作者观点,不代表本站立场。
本文系作者授权发表,未经许可,不得转载。

发表评论

评论列表(0人评论 , 2人围观)
☹还没有评论,来说两句吧...

热门标签

    此处不必修改,程序自动调用!